Boiler-plant:
10 off Babcock &Wilcox
180,000lb/hr traveling GrateStokers
(Click
on thumbnail)
Problem: Very short operating periods because of the poor quality of coal and
problems with operation.
RESULTS FROM USING SAPEC
Extended operating Periods from 8 weeks to 21
weeks.
No
fall of in output despite boiler using 22058 tonnes of coal compared to
normal operation cycle 8400 tonnes a 262% increase.
Boiler
cleaned in 5 days instead of usual 21 days
Gauteng
Power Station 2
Boiler-plant: 20 off Babcock & Wilcox water-tube
boilers with traveling grate stokers. Designed MCR-180,000lb/hr now de-rated to
150,000lb/hr. Coal 430,000 tonnes per annum (Grade D Delmas coal)
RESULTS FROM USING SAPEC
Extended
operating period from 700 hours to 2400 hours